Affected Unit Published Date/Time Event Type Event Status Event Start Date/Time Event End Date/Time Available Capacity Cause Related Information
T_LAGA-1 19/08/2019
15:24PM
Planned Ongoing 30/09/2019
23:30PM
13/10/2019
23:30PM
0 Boiler Extension to B3 / PSSR outage
T_LAGA-1 05/08/2019
15:25PM
Planned Ongoing 19/09/2019
23:30PM
30/09/2019
23:30PM
0 Boiler extension to PSSR / B3 Inspection
T_LAGA-1 02/08/2019
09:35AM
Planned Ongoing 12/09/2019
23:55PM
19/09/2019
23:30PM
0 Boiler Extension to PSSR / B3 Inspection Outage
T_LAGA-1 22/07/2019
19:56PM
Planned Superseded 11/08/2019
23:00PM
12/09/2019
23:55PM
0 Outage Ends
T_LAGA-1 22/07/2019
16:35PM
Planned Ongoing 11/08/2019
23:00PM
12/09/2019
23:55PM
808 Outage Ends
T_LAGA-1 18/06/2019
08:28AM
Planned Future 03/07/2019
23:00PM
05/07/2019
22:00PM
0 Early start to planned outage Early start to planned PSSR outage to allow repairs to HRSG tube leaks before the main programme of work starts
T_LAGA-1 11/06/2019
15:15PM
Planned Other unavailability - Active 11/06/2019
15:10PM
11/06/2019
15:30PM
842 Test Message Take No Action Testing links into EPUKI landing page - Dave Mogridge EP Langage
T_LAGA-1 22/05/2019
09:57AM
Unplanned Completed 22/05/2019
10:00AM
22/05/2019
12:00PM
905
T_LAGA-1 20/05/2019
16:11PM
Planned Future 21/05/2019
23:00PM
22/05/2019
12:00PM
416 Turbine
T_LAGA-1 20/05/2019
16:03PM
Planned Completed 20/05/2019
23:00PM
21/05/2019
12:00PM
905 Turbine
T_LAGA-1 20/05/2019
14:13PM
Planned Future 20/05/2019
23:00PM
21/05/2019
12:00PM
420 Turbine
T_LAGA-1 19/05/2019
18:27PM
Unplanned Completed 19/05/2019
18:30PM
19/05/2019
23:30PM
823 Outage Ends
T_LAGA-1 19/05/2019
17:15PM
Unplanned Ongoing 19/05/2019
17:14PM
19/05/2019
23:30PM
400 Turbine
T_LAGA-1 18/05/2019
22:53PM
Planned Completed 18/05/2019
22:49PM
19/05/2019
12:00PM
820 Boiler
T_LAGA-1 10/05/2019
16:28PM
Planned Future 17/05/2019
23:59PM
19/05/2019
11:59AM
410 Boiler
T_LAGA-1 07/05/2019
07:27AM
Unplanned Completed 07/05/2019
07:24AM
07/05/2019
09:30AM
905 Turbine
T_LAGA-1 07/05/2019
05:28AM
Unplanned Ongoing 07/05/2019
05:27AM
07/05/2019
09:30AM
410 Turbine Air inlet
T_LAGA-1 07/05/2019
02:36AM
Unplanned Completed 07/05/2019
02:35AM
07/05/2019
05:00AM
862 Boiler
T_LAGA-1 07/05/2019
00:12AM
Unplanned Ongoing 07/05/2019
00:11AM
07/05/2019
05:00AM
410 Boiler IP Bypass CV.
T_LAGA-1 09/04/2019
16:24PM
Planned Superseded 11/04/2019
06:00AM
14/04/2019
23:30PM
415 Turbine GT Thermocouple Repairs
T_LAGA-1 04/04/2019
15:49PM
Planned Future 12/04/2019
12:00PM
14/04/2019
23:00PM
415 Turbine GT Thermocouple repairs
T_LAGA-1 04/04/2019
13:02PM
Planned Ongoing 04/04/2019
14:00PM
04/04/2019
15:00PM
400 Boiler
T_LAGA-1 03/04/2019
09:50AM
Planned Future 03/04/2019
23:00PM
04/04/2019
14:00PM
400 Boiler
T_LAGA-1 25/03/2019
09:10AM
Planned Ongoing 25/03/2019
09:30AM
25/03/2019
10:30AM
405 Station Limit
T_LAGA-1 25/03/2019
08:16AM
Unplanned Completed 25/03/2019
08:30AM
25/03/2019
11:00AM
878 Turbine
T_LAGA-1 25/03/2019
06:58AM
Unplanned Ongoing 25/03/2019
06:55AM
25/03/2019
11:00AM
405 Turbine
T_LAGA-1 26/02/2019
17:59PM
Unplanned Completed 26/02/2019
17:59PM
26/02/2019
23:55PM
861 Turbine
T_LAGA-1 25/02/2019
10:33AM
Unplanned Ongoing 25/02/2019
10:31AM
26/02/2019
23:55PM
0 Turbine
T_LAGA-1 24/02/2019
11:40AM
Unplanned Ongoing 24/02/2019
19:00PM
25/02/2019
23:59PM
0 Turbine
T_LAGA-1 24/02/2019
07:10AM
Unplanned Ongoing 24/02/2019
07:10AM
24/02/2019
19:00PM
0 Turbine
T_LAGA-1 29/01/2019
15:00PM
Unplanned Completed 29/01/2019
14:59PM
29/01/2019
23:30PM
860 Turbine
T_LAGA-1 29/01/2019
12:14PM
Unplanned Ongoing 29/01/2019
15:00PM
29/01/2019
23:30PM
400 Turbine
T_LAGA-1 29/01/2019
11:17AM
Unplanned Ongoing 29/01/2019
13:00PM
29/01/2019
15:00PM
400 Turbine
T_LAGA-1 29/01/2019
09:22AM
Unplanned Ongoing 29/01/2019
09:59AM
29/01/2019
13:00PM
400 Turbine
T_LAGA-1 29/01/2019
05:59AM
Unplanned Ongoing 29/01/2019
05:57AM
29/01/2019
09:59AM
400 Turbine
T_LAGA-1 19/01/2019
15:17PM
Unplanned Ongoing 20/01/2019
23:30PM
21/01/2019
23:30PM
410 Boiler
T_LAGA-1 16/01/2019
09:42AM
Unplanned Ongoing 16/01/2019
23:30PM
20/01/2019
23:30PM
400 Boiler
T_LAGA-1 15/01/2019
12:34PM
Unplanned Ongoing 15/01/2019
12:33PM
16/01/2019
23:30PM
400 Boiler
T_LAGA-1 10/01/2019
11:15AM
Unplanned Completed 10/01/2019
11:14AM
10/01/2019
23:55PM
905 Outage Ends
T_LAGA-1 10/01/2019
10:23AM
Unplanned Ongoing 10/01/2019
10:22AM
10/01/2019
23:55PM
430 Turbine
T_LAGA-1 10/01/2019
07:17AM
Unplanned Ongoing 10/01/2019
07:17AM
10/01/2019
12:00PM
435 Turbine
T_LAGA-1 10/01/2019
06:02AM
Unplanned Ongoing 10/01/2019
06:01AM
10/01/2019
09:00AM
435 Turbine
T_LAGA-1 07/01/2019
12:04PM
Unplanned Ongoing 07/01/2019
14:00PM
07/01/2019
18:00PM
420 Boiler
T_LAGA-1 07/01/2019
10:19AM
Unplanned Ongoing 07/01/2019
12:00PM
07/01/2019
14:00PM
420 Boiler
T_LAGA-1 07/01/2019
04:58AM
Unplanned Ongoing 07/01/2019
04:56AM
07/01/2019
12:00PM
420 Boiler
T_LAGA-1 06/01/2019
08:00AM
Planned Completed 06/01/2019
07:59AM
06/01/2019
10:00AM
880 Turbine Repair Complete.
T_LAGA-1 04/01/2019
16:17PM
Planned Superseded 05/01/2019
22:00PM
06/01/2019
10:00AM
430 Turbine
T_LAGA-1 04/01/2019
16:00PM
Planned Future 05/01/2019
21:00PM
06/01/2019
09:00AM
430 Turbine
T_LAGA-1 29/11/2018
23:16PM
Unplanned Superseded 29/11/2018
23:15PM
30/11/2018
05:00AM
830 Outage Ends
T_LAGA-1 29/11/2018
10:48AM
Unplanned Ongoing 29/11/2018
10:47AM
30/11/2018
05:00AM
400 Boiler
T_LAGA-1 29/11/2018
06:20AM
Unplanned Ongoing 29/11/2018
06:20AM
29/11/2018
16:00PM
400 Boiler
T_LAGA-1 22/11/2018
15:59PM
Unplanned Ongoing 22/11/2018
16:00PM
22/11/2018
16:30PM
419 Boiler
T_LAGA-1 22/11/2018
12:25PM
Unplanned Ongoing 22/11/2018
12:24PM
22/11/2018
15:30PM
419 Boiler
T_LAGA-1 22/11/2018
08:04AM
Unplanned Ongoing 22/11/2018
08:02AM
22/11/2018
14:00PM
419 Boiler
T_LAGA-1 22/11/2018
04:59AM
Unplanned Ongoing 22/11/2018
04:58AM
22/11/2018
11:00AM
419 Boiler
T_LAGA-1 22/11/2018
02:03AM
Unplanned Ongoing 22/11/2018
02:03AM
22/11/2018
06:03AM
419 Boiler
T_LAGA-1 16/11/2018
16:34PM
Unplanned Completed 16/11/2018
16:33PM
19/11/2018
23:00PM
803 Outage Ends
T_LAGA-1 15/11/2018
09:55AM
Planned Superseded 18/11/2018
23:59PM
19/11/2018
23:00PM
0 Turbine
T_LAGA-1 15/11/2018
09:33AM
Planned Future 15/11/2018
23:00PM
18/11/2018
23:59PM
0 Turbine
T_LAGA-1 08/11/2018
16:59PM
Unplanned Ongoing 08/11/2018
16:58PM
08/11/2018
18:25PM
400 Turbine
T_LAGA-1 08/11/2018
16:18PM
Unplanned Completed 08/11/2018
17:30PM
08/11/2018
18:50PM
836 Turbine Unit available
T_LAGA-1 08/11/2018
16:11PM
Unplanned Ongoing 08/11/2018
16:09PM
08/11/2018
17:30PM
400 Turbine
T_LAGA-1 08/11/2018
14:52PM
Unplanned Ongoing 08/11/2018
14:51PM
08/11/2018
18:50PM
400 Turbine
T_LAGA-1 27/10/2018
14:54PM
Planned Completed 27/10/2018
15:00PM
27/10/2018
16:00PM
862 Early end to planned outage
T_LAGA-1 27/10/2018
11:49AM
Planned Ongoing 27/10/2018
12:30PM
27/10/2018
16:00PM
0 Boiler
T_LAGA-1 27/10/2018
11:11AM
Planned Ongoing 27/10/2018
11:30AM
27/10/2018
12:30PM
0 Boiler
T_LAGA-1 27/10/2018
06:07AM
Planned Superseded 27/10/2018
06:06AM
27/10/2018
11:30AM
0 Boiler
T_LAGA-1 27/10/2018
06:03AM
Unplanned Superseded 27/10/2018
06:03AM
27/10/2018
11:30AM
0 Boiler
T_LAGA-1 27/10/2018
02:17AM
Unplanned Superseded 27/10/2018
02:16AM
27/10/2018
07:30AM
0 Boiler
T_LAGA-1 25/10/2018
09:48AM
Planned Future 25/10/2018
21:30PM
27/10/2018
03:30AM
0 Boiler
T_LAGA-1 20/10/2018
19:34PM
Planned Completed 20/10/2018
20:00PM
22/10/2018
03:00AM
856 Early end to planned outage
T_LAGA-1 08/10/2018
23:04PM
Planned Future 18/10/2018
00:00AM
22/10/2018
03:00AM
0 Boiler
T_LAGA-1 20/09/2018
06:22AM
Unplanned Ongoing 20/09/2018
06:12AM
20/09/2018
07:30AM
60 Turbine
T_LAGA-1 30/08/2018
07:09AM
Unplanned Completed 30/08/2018
07:30AM
30/08/2018
07:51AM
824 Turbine
T_LAGA-1 30/08/2018
06:13AM
Unplanned Ongoing 30/08/2018
06:12AM
30/08/2018
07:51AM
350 Turbine
T_LAGA-1 30/08/2018
05:52AM
Unplanned Ongoing 30/08/2018
05:51AM
30/08/2018
07:51AM
200 Turbine
T_LAGA-1 18/08/2018
21:07PM
Planned Completed 18/08/2018
21:30PM
18/08/2018
23:00PM
905 Outage Ends
T_LAGA-1 18/08/2018
16:04PM
Planned Completed 18/08/2018
23:00PM
19/08/2018
23:00PM
821 Outage Ends
T_LAGA-1 18/08/2018
14:18PM
Planned Superseded 18/08/2018
14:17PM
19/08/2018
23:00PM
402 Early end to planned outage
T_LAGA-1 11/08/2018
18:24PM
Unplanned Ongoing 11/08/2018
19:00PM
14/08/2018
23:00PM
410 Boiler
T_LAGA-1 10/08/2018
12:46PM
Unplanned Superseded 10/08/2018
12:46PM
10/08/2018
14:40PM
0 Turbine
T_LAGA-1 10/08/2018
10:19AM
Unplanned Ongoing 10/08/2018
10:20AM
10/08/2018
14:00PM
0 Turbine
T_LAGA-1 02/08/2018
17:48PM
Planned Future 14/08/2018
23:00PM
19/08/2018
23:00PM
0 Turbine
T_LAGA-1 02/07/2018
19:52PM
Unplanned Ongoing 02/07/2018
19:51PM
02/07/2018
23:59PM
400 Boiler
T_LAGA-1 20/06/2018
12:04PM
Unplanned Completed 20/06/2018
12:04PM
20/06/2018
14:40PM
840 Turbine
T_LAGA-1 20/06/2018
08:41AM
Unplanned Ongoing 20/06/2018
08:40AM
20/06/2018
14:40PM
400 Turbine
T_LAGA-1 20/06/2018
05:37AM
Unplanned Ongoing 20/06/2018
05:36AM
20/06/2018
09:30AM
400 Turbine
T_LAGA-1 15/06/2018
06:03AM
Unplanned Completed 15/06/2018
06:02AM
15/06/2018
09:30AM
905 Boiler
T_LAGA-1 15/06/2018
05:17AM
Unplanned Ongoing 15/06/2018
05:15AM
15/06/2018
09:30AM
400 Boiler
T_LAGA-1 11/06/2018
02:56AM
Unplanned Completed 11/06/2018
02:55AM
11/06/2018
12:00PM
820 Boiler
T_LAGA-1 10/06/2018
22:39PM
Unplanned Ongoing 10/06/2018
23:30PM
11/06/2018
12:00PM
396 Boiler
T_LAGA-1 10/06/2018
10:50AM
Unplanned Superseded 10/06/2018
10:50AM
10/06/2018
23:30PM
396 Boiler
T_LAGA-1 10/06/2018
00:17AM
Unplanned Ongoing 10/06/2018
00:17AM
10/06/2018
15:00PM
396 Boiler
T_LAGA-1 06/06/2018
18:44PM
Unplanned Superseded 06/06/2018
18:43PM
06/06/2018
19:30PM
412 Boiler
T_LAGA-1 06/06/2018
18:03PM
Unplanned Superseded 06/06/2018
18:03PM
06/06/2018
19:00PM
412 Boiler
T_LAGA-1 06/06/2018
17:33PM
Unplanned Superseded 06/06/2018
17:32PM
06/06/2018
18:30PM
412 Boiler
T_LAGA-1 06/06/2018
13:55PM
Unplanned Superseded 06/06/2018
13:53PM
06/06/2018
18:00PM
412 Boiler
T_LAGA-1 06/06/2018
11:08AM
Unplanned Superseded 06/06/2018
11:07AM
06/06/2018
15:00PM
412 Boiler
T_LAGA-1 06/06/2018
05:14AM
Unplanned Superseded 06/06/2018
05:14AM
06/06/2018
12:30PM
400 Boiler
T_LAGA-1 06/06/2018
04:56AM
Unplanned Ongoing 06/06/2018
04:56AM
06/06/2018
08:56AM
400 Boiler
T_LAGA-1 03/06/2018
14:52PM
Unplanned Completed 03/06/2018
14:50PM
03/06/2018
15:45PM
905 Under Investigation
T_LAGA-1 03/06/2018
13:47PM
Unplanned Ongoing 03/06/2018
13:45PM
03/06/2018
15:45PM
400 Under Investigation HRSG11 LP drum
T_LAGA-1 30/05/2018
07:28AM
Unplanned Completed 30/05/2018
07:27AM
30/05/2018
08:35AM
823 Outage Ends
T_LAGA-1 30/05/2018
04:38AM
Unplanned Ongoing 30/05/2018
04:38AM
30/05/2018
08:35AM
400 Boiler
T_LAGA-1 25/05/2018
06:03AM
Unplanned Ongoing 25/05/2018
06:01AM
25/05/2018
08:53AM
408 Turbine
T_LAGA-1 23/05/2018
11:42AM
Planned Completed 23/05/2018
11:42AM
23/05/2018
23:59PM
837 Outage Ends
T_LAGA-1 23/05/2018
11:26AM
Planned Completed 23/05/2018
11:25AM
23/05/2018
23:30PM
837 Outage Ends
T_LAGA-1 21/05/2018
09:38AM
Planned Superseded 23/05/2018
23:59PM
24/05/2018
23:59PM
842 Early end to planned outage
T_LAGA-1 18/05/2018
16:46PM
Planned Completed 18/05/2018
17:00PM
18/05/2018
20:00PM
406 Early end to planned outage
T_LAGA-1 18/05/2018
16:25PM
Planned Ongoing 18/05/2018
18:00PM
18/05/2018
20:00PM
0 Boiler
T_LAGA-1 18/05/2018
11:24AM
Planned Ongoing 18/05/2018
12:00PM
18/05/2018
18:00PM
0 Boiler
T_LAGA-1 17/05/2018
16:41PM
Planned Ongoing 17/05/2018
23:59PM
18/05/2018
12:00PM
0 Boiler
T_LAGA-1 04/05/2018
16:21PM
Planned Future 18/05/2018
00:00AM
24/05/2018
23:59PM
406 Boiler
T_LAGA-1 04/05/2018
16:18PM
Planned Ongoing 08/05/2018
00:00AM
17/05/2018
23:59PM
0 Boiler
T_LAGA-1 01/05/2018
08:18AM
Planned Future 12/05/2018
00:00AM
21/05/2018
23:59PM
406 Boiler
T_LAGA-1 30/04/2018
12:36PM
Planned Future 08/05/2018
00:00AM
11/05/2018
23:59PM
406 Boiler
T_LAGA-1 30/04/2018
12:34PM
Planned Ongoing 05/05/2018
00:00AM
07/05/2018
23:59PM
0 Boiler Extension to A5 Planned Maintenance Inspection
T_LAGA-1 27/04/2018
16:24PM
Planned Future 05/05/2018
00:00AM
11/05/2018
23:59PM
406 Boiler
T_LAGA-1 27/04/2018
16:21PM
Planned Ongoing 03/05/2018
00:00AM
04/05/2018
23:59PM
0 Boiler Extension to A5 Planned Maintenance Outage
T_LAGA-1 26/04/2018
16:35PM
Planned Ongoing 29/04/2018
23:00PM
02/05/2018
23:59PM
0 Boiler Extension to A5 Planned Maintenance Outage
T_LAGA-1 25/03/2018
16:58PM
Unplanned Superseded 25/03/2018
16:57PM
25/03/2018
18:30PM
400 Turbine
T_LAGA-1 25/03/2018
16:04PM
Unplanned Superseded 25/03/2018
16:03PM
25/03/2018
17:30PM
400 Turbine
T_LAGA-1 25/03/2018
14:08PM
Unplanned Ongoing 25/03/2018
14:30PM
25/03/2018
15:30PM
400 Turbine
T_LAGA-1 19/03/2018
06:45AM
Unplanned Ongoing 19/03/2018
06:42AM
19/03/2018
07:42AM
45 Turbine
T_LAGA-1 06/03/2018
06:50AM
Unplanned Completed 06/03/2018
06:49AM
06/03/2018
08:00AM
838 Generator
T_LAGA-1 06/03/2018
06:00AM
Unplanned Ongoing 06/03/2018
06:00AM
06/03/2018
08:00AM
400 Generator
T_LAGA-1 03/03/2018
10:42AM
Unplanned Completed 03/03/2018
10:41AM
03/03/2018
13:00PM
837 Fuel Supply
T_LAGA-1 03/03/2018
10:16AM
Unplanned Completed 03/03/2018
10:15AM
03/03/2018
10:16AM
837 Fuel Supply
T_LAGA-1 03/03/2018
09:00AM
Unplanned Ongoing 03/03/2018
08:57AM
03/03/2018
13:00PM
400 Fuel Supply
T_LAGA-1 01/03/2018
17:55PM
Unplanned Superseded 01/03/2018
20:50PM
02/03/2018
05:00AM
0 Fuel Supply
T_LAGA-1 01/03/2018
15:43PM
Unplanned Ongoing 01/03/2018
17:00PM
01/03/2018
23:00PM
550 Fuel Supply
T_LAGA-1 01/03/2018
08:43AM
Unplanned Ongoing 01/03/2018
08:42AM
01/03/2018
11:00AM
0 Cooling Systems
T_LAGA-1 01/03/2018
04:56AM
Unplanned Ongoing 01/03/2018
04:51AM
01/03/2018
09:30AM
0 Cooling Systems Frozen instruments
T_LAGA-1 28/02/2018
08:41AM
Unplanned Ongoing 28/02/2018
08:41AM
28/02/2018
11:00AM
0 Cooling Systems
T_LAGA-1 28/02/2018
07:58AM
Unplanned Ongoing 28/02/2018
08:00AM
28/02/2018
09:30AM
0 Cooling Systems
T_LAGA-1 28/02/2018
05:32AM
Unplanned Ongoing 28/02/2018
05:25AM
28/02/2018
09:30AM
882 Cooling Systems
T_LAGA-1 25/02/2018
12:44PM
Planned Completed 25/02/2018
13:00PM
25/02/2018
17:40PM
843 Early end to planned outage
T_LAGA-1 22/02/2018
15:38PM
Planned Future 24/02/2018
23:40PM
25/02/2018
17:40PM
0 Boiler Repair to IP bypasss pipework
T_LAGA-1 22/02/2018
15:36PM
Planned Superseded 24/02/2018
23:00PM
24/02/2018
23:40PM
832 Boiler Change of Outage start time
T_LAGA-1 22/02/2018
15:26PM
Planned Future 24/02/2018
23:00PM
25/02/2018
17:00PM
0 Boiler Repairs to IP bypass and Hogger pipework
T_LAGA-1 21/01/2018
09:35AM
Planned Ongoing 21/01/2018
09:34AM
21/01/2018
11:00AM
400 Turbine
T_LAGA-1 21/01/2018
08:13AM
Planned Ongoing 21/01/2018
08:12AM
21/01/2018
10:00AM
400 Turbine
T_LAGA-1 19/01/2018
16:16PM
Planned Future 21/01/2018
03:00AM
21/01/2018
09:00AM
400 Turbine
T_LAGA-1 19/01/2018
12:01PM
Planned Completed 19/01/2018
12:00PM
19/01/2018
13:00PM
830 Early end to planned outage
T_LAGA-1 19/01/2018
08:01AM
Planned Superseded 19/01/2018
07:59AM
19/01/2018
13:00PM
815 Commissioning - Variable Output
T_LAGA-1 18/01/2018
16:25PM
Planned Future 19/01/2018
07:00AM
19/01/2018
13:00PM
800 Commissioning - Variable Output
T_LAGA-1 18/01/2018
16:20PM
Planned Future 19/01/2018
00:00AM
19/01/2018
06:00AM
400 Commissioning - Variable Output
T_LAGA-1 18/01/2018
15:08PM
Planned Completed 18/01/2018
15:00PM
18/01/2018
16:00PM
823 Turbine
T_LAGA-1 18/01/2018
15:00PM
Planned Completed 18/01/2018
15:00PM
18/01/2018
15:00PM
823 Turbine Auto tune on GT12 complete
T_LAGA-1 17/01/2018
13:53PM
Planned Future 18/01/2018
10:00AM
18/01/2018
16:00PM
400 Commissioning - Variable Output GT 12 Autotune testing and commissioning
T_LAGA-1 16/01/2018
14:29PM
Planned Completed 16/01/2018
14:27PM
16/01/2018
15:00PM
820 Early end to planned outage Early end to GT 12 Autotune commissioning
T_LAGA-1 16/01/2018
08:27AM
Planned Superseded 16/01/2018
08:26AM
16/01/2018
15:00PM
400 Commissioning - Variable Output Output amended
T_LAGA-1 16/01/2018
08:11AM
Planned Superseded 16/01/2018
08:10AM
16/01/2018
15:00PM
600 Commissioning - Variable Output Output updated
T_LAGA-1 16/01/2018
07:48AM
Planned Ongoing 16/01/2018
13:00PM
16/01/2018
15:00PM
400 Commissioning - Variable Output Extension of commissioning period
T_LAGA-1 15/01/2018
20:10PM
Planned Ongoing 15/01/2018
20:09PM
15/01/2018
22:30PM
400 Commissioning - Variable Output
T_LAGA-1 15/01/2018
15:31PM
Planned Future 16/01/2018
05:00AM
16/01/2018
13:00PM
400 Commissioning - Variable Output GT12 Auto tune commissioning
T_LAGA-1 15/01/2018
15:29PM
Planned Superseded 15/01/2018
17:00PM
16/01/2018
05:00AM
830 Early end to planned outage GT12 Auto tune. Plant available overnight
T_LAGA-1 15/01/2018
07:07AM
Planned Ongoing 15/01/2018
07:06AM
15/01/2018
09:30AM
420 Turbine 1/2 hour Delayed GT start.
T_LAGA-1 15/01/2018
01:03AM
Planned Superseded 15/01/2018
01:30AM
15/01/2018
05:00AM
400 Early end to planned outage
T_LAGA-1 12/01/2018
18:17PM
Unplanned Ongoing 12/01/2018
18:17PM
12/01/2018
20:30PM
0 Boiler
T_LAGA-1 12/01/2018
17:45PM
Unplanned Ongoing 12/01/2018
17:44PM
12/01/2018
20:30PM
45 Boiler
T_LAGA-1 11/01/2018
08:25AM
Planned Ongoing 15/01/2018
12:00PM
16/01/2018
21:00PM
600 Commissioning - Variable Output GT 12 Autotune commissioning phase, variable output up to 600MW
T_LAGA-1 11/01/2018
08:23AM
Planned Future 15/01/2018
05:00AM
15/01/2018
12:00PM
400 Turbine GT 12 Autotune test
T_LAGA-1 10/01/2018
07:29AM
Unplanned Completed 10/01/2018
07:29AM
10/01/2018
10:30AM
802 Turbine
T_LAGA-1 10/01/2018
06:22AM
Unplanned Ongoing 10/01/2018
06:21AM
10/01/2018
10:21AM
0 Turbine
T_LAGA-1 08/01/2018
07:06AM
Unplanned Ongoing 08/01/2018
07:05AM
08/01/2018
09:32AM
0 Boiler
T_LAGA-1 04/01/2018
17:07PM
Planned Completed 04/01/2018
17:07PM
05/01/2018
23:55PM
808 Outage Ends
T_LAGA-1 04/01/2018
08:58AM
Planned Ongoing 05/01/2018
19:30PM
05/01/2018
23:55PM
400 Turbine On-going ACC leak checks and repairs
T_LAGA-1 04/01/2018
08:43AM
Planned Ongoing 04/01/2018
19:30PM
05/01/2018
19:30PM
400 Turbine On-going ACC leak checks and repairs
T_LAGA-1 03/01/2018
10:02AM
Planned Ongoing 03/01/2018
10:00AM
03/01/2018
17:00PM
400 Commissioning - Variable Output Increased MEL value during on-going ACC leak investigation
T_LAGA-1 03/01/2018
09:45AM
Planned Ongoing 03/01/2018
19:00PM
04/01/2018
06:30AM
400 Turbine Half the plant fully available overnight
T_LAGA-1 03/01/2018
09:39AM
Planned Ongoing 03/01/2018
17:00PM
03/01/2018
19:00PM
400 Commissioning - Variable Output
T_LAGA-1 02/01/2018
19:19PM
Planned Future 04/01/2018
06:30AM
04/01/2018
19:30PM
400 Commissioning - Variable Output
T_LAGA-1 02/01/2018
19:18PM
Unplanned Ongoing 03/01/2018
17:00PM
04/01/2018
06:30AM
0 Turbine
T_LAGA-1 02/01/2018
19:12PM
Planned Future 03/01/2018
08:00AM
03/01/2018
17:00PM
200 Commissioning - Variable Output
T_LAGA-1 02/01/2018
17:25PM
Unplanned Ongoing 02/01/2018
18:00PM
03/01/2018
08:00AM
0 Turbine
T_LAGA-1 02/01/2018
11:02AM
Planned Superseded 02/01/2018
12:00PM
02/01/2018
18:00PM
400 Commissioning - Variable Output On going Air Ingress checks
T_LAGA-1 31/12/2017
08:08AM
Planned Superseded 31/12/2017
12:00PM
02/01/2018
12:00PM
0 Turbine High O2 air ingress
T_LAGA-1 30/12/2017
09:58AM
Planned Future 30/12/2017
21:00PM
31/12/2017
12:00PM
0 Turbine High O2 levels
T_LAGA-1 29/12/2017
16:57PM
Planned Future 30/12/2017
04:30AM
30/12/2017
14:15PM
0 Turbine O2 ingress in ACC
T_LAGA-1 24/12/2017
16:23PM
Unplanned Completed 24/12/2017
16:23PM
24/12/2017
16:30PM
33 Turbine
T_LAGA-1 24/12/2017
15:13PM
Unplanned Ongoing 24/12/2017
15:13PM
24/12/2017
16:30PM
33 Turbine
T_LAGA-1 21/12/2017
13:33PM
Planned Future 22/12/2017
10:00AM
22/12/2017
10:30AM
400 Boiler
T_LAGA-1 18/12/2017
06:06AM
Unplanned Ongoing 18/12/2017
06:03AM
18/12/2017
08:03AM
0 Under Investigation
T_LAGA-1 15/12/2017
14:35PM
Unplanned Superseded 15/12/2017
14:33PM
15/12/2017
19:30PM
415 Boiler
T_LAGA-1 15/12/2017
07:41AM
Unplanned Ongoing 15/12/2017
07:38AM
15/12/2017
17:00PM
400 Boiler
T_LAGA-1 09/12/2017
06:32AM
Unplanned Superseded 09/12/2017
06:30AM
09/12/2017
07:30AM
0 Turbine
T_LAGA-1 09/12/2017
05:54AM
Unplanned Ongoing 09/12/2017
05:52AM
09/12/2017
06:55AM
0 Turbine
T_LAGA-1 01/12/2017
10:20AM
Unplanned Completed 01/12/2017
10:25AM
01/12/2017
12:00PM
873 Outage Ends
T_LAGA-1 01/12/2017
00:12AM
Unplanned Ongoing 01/12/2017
00:09AM
01/12/2017
12:00PM
434 Boiler
T_LAGA-1 27/11/2017
00:11AM
Planned Completed 27/11/2017
00:30AM
27/11/2017
03:00AM
854 Early end to planned outage
T_LAGA-1 26/11/2017
13:27PM
Planned Completed 27/11/2017
03:00AM
29/11/2017
06:00AM
854 Early end to planned outage Repairs to both boilers completed earlier than expected
T_LAGA-1 24/11/2017
09:28AM
Unplanned Ongoing 24/11/2017
09:26AM
24/11/2017
21:00PM
0 Boiler
T_LAGA-1 23/11/2017
09:18AM
Unplanned Ongoing 23/11/2017
09:13AM
23/11/2017
12:00PM
0 Turbine
T_LAGA-1 22/11/2017
18:53PM
Unplanned Ongoing 22/11/2017
21:30PM
23/11/2017
09:00AM
0 Turbine
T_LAGA-1 22/11/2017
16:52PM
Unplanned Ongoing 22/11/2017
17:20PM
22/11/2017
21:30PM
0 Turbine
T_LAGA-1 22/11/2017
16:33PM
Planned Future 24/11/2017
21:00PM
27/11/2017
03:00AM
0 Boiler
T_LAGA-1 22/11/2017
13:21PM
Unplanned Ongoing 22/11/2017
13:20PM
22/11/2017
17:20PM
0 Turbine
T_LAGA-1 21/11/2017
15:47PM
Planned Future 21/11/2017
23:00PM
29/11/2017
06:00AM
427 Boiler PLEASE NOTE. Variable maximum output during this outage from 0MW to 427MW See REMIT submission and TOGA for details
T_LAGA-1 21/11/2017
15:36PM
Planned Future 23/11/2017
21:00PM
27/11/2017
03:00AM
854 Boiler Over writing Planned Outage - New extended Outage to follow
T_LAGA-1 18/11/2017
20:49PM
Unplanned Completed 18/11/2017
20:47PM
18/11/2017
23:59PM
905 Outage Ends
T_LAGA-1 18/11/2017
15:10PM
Unplanned Superseded 18/11/2017
15:08PM
18/11/2017
23:59PM
0 Turbine
T_LAGA-1 18/11/2017
11:57AM
Unplanned Ongoing 18/11/2017
11:56AM
18/11/2017
15:56PM
0 Turbine
T_LAGA-1 17/11/2017
10:03AM
Unplanned Ongoing 17/11/2017
21:30PM
18/11/2017
15:30PM
400 Boiler Valve gland re-pack
T_LAGA-1 17/11/2017
08:56AM
Planned Future 23/11/2017
21:00PM
27/11/2017
03:00AM
0 Boiler Early start to weekend planned Maintenance Outage - Over writes previous REMIT submission
T_LAGA-1 16/11/2017
14:10PM
Planned Future 12/01/2018
21:00PM
15/01/2018
05:00AM
450 Turbine Auto Tune installation on GT 12 only
T_LAGA-1 16/11/2017
14:07PM
Unplanned Ongoing 24/11/2017
21:00PM
27/11/2017
03:00AM
0 Boiler
T_LAGA-1 11/11/2017
16:23PM
Unplanned Ongoing 11/11/2017
16:20PM
11/11/2017
17:10PM
30 Turbine WSC Level issues and STG Failed to start.
T_LAGA-1 10/11/2017
09:54AM
Planned Future 10/11/2017
10:45AM
10/11/2017
12:45PM
400 Plant Inspection
T_LAGA-1 05/11/2017
10:46AM
Unplanned Completed 05/11/2017
10:45AM
05/11/2017
12:28PM
905 Boiler
T_LAGA-1 05/11/2017
09:43AM
Unplanned Ongoing 05/11/2017
09:41AM
05/11/2017
12:28PM
0 Boiler
T_LAGA-1 05/11/2017
09:27AM
Unplanned Ongoing 05/11/2017
09:23AM
05/11/2017
12:28PM
450 Boiler HP Bypass HRSG12
T_LAGA-1 05/11/2017
08:35AM
Unplanned Ongoing 05/11/2017
08:28AM
05/11/2017
12:28PM
905 Under Investigation
T_LAGA-1 25/10/2017
15:50PM
Unplanned Completed 25/10/2017
15:47PM
25/10/2017
20:00PM
905 Generator
T_LAGA-1 25/10/2017
10:48AM
Unplanned Superseded 25/10/2017
12:30PM
25/10/2017
20:00PM
400 Generator GT trip investigation ongoing
T_LAGA-1 25/10/2017
08:42AM
Unplanned Superseded 25/10/2017
10:23AM
25/10/2017
12:30PM
400 Generator
T_LAGA-1 25/10/2017
06:25AM
Unplanned Ongoing 25/10/2017
06:23AM
25/10/2017
10:23AM
400 Generator
T_LAGA-1 18/10/2017
12:13PM
Planned Future 01/06/2023
23:00PM
12/06/2023
23:00PM
0 Plant Inspection
T_LAGA-1 18/10/2017
12:10PM
Planned Future 01/07/2022
23:00PM
04/08/2022
23:00PM
0 Plant Inspection
T_LAGA-1 18/10/2017
12:08PM
Planned Future 01/07/2021
23:00PM
12/08/2021
23:00PM
0 Plant Inspection
T_LAGA-1 17/10/2017
08:59AM
Unplanned Superseded 17/10/2017
08:57AM
17/10/2017
09:14AM
905 Outage Ends
T_LAGA-1 17/10/2017
05:16AM
Unplanned Ongoing 17/10/2017
05:14AM
17/10/2017
09:14AM
400 Turbine
T_LAGA-1 06/10/2017
02:00AM
Unplanned Superseded 06/10/2017
01:59AM
06/10/2017
05:00AM
905 Outage Ends
T_LAGA-1 06/10/2017
01:00AM
Unplanned Ongoing 06/10/2017
01:00AM
06/10/2017
05:00AM
0 Turbine
T_LAGA-1 30/09/2017
03:10AM
Unplanned Completed 30/09/2017
03:07AM
30/09/2017
03:30AM
905
T_LAGA-1 30/09/2017
01:48AM
Unplanned Ongoing 30/09/2017
01:45AM
30/09/2017
05:45AM
0 Turbine
T_LAGA-1 28/09/2017
05:40AM
Planned Superseded 28/09/2017
05:38AM
28/09/2017
10:00AM
0 Turbine
T_LAGA-1 28/09/2017
02:23AM
Planned Superseded 28/09/2017
05:03AM
28/09/2017
12:00PM
0 Turbine
T_LAGA-1 28/09/2017
01:05AM
Unplanned Ongoing 28/09/2017
01:04AM
28/09/2017
05:03AM
0 Turbine
T_LAGA-1 27/09/2017
13:09PM
Unplanned Ongoing 27/09/2017
13:04PM
27/09/2017
21:30PM
420 Turbine
T_LAGA-1 27/09/2017
12:10PM
Unplanned Completed 27/09/2017
12:06PM
27/09/2017
23:55PM
905 Outage Ends
T_LAGA-1 27/09/2017
08:06AM
Unplanned Superseded 27/09/2017
08:06AM
27/09/2017
23:59PM
420 Turbine
T_LAGA-1 27/09/2017
06:11AM
Unplanned Ongoing 27/09/2017
05:11AM
27/09/2017
09:11AM
420 Turbine
T_LAGA-1 27/09/2017
05:29AM
Unplanned Superseded 27/09/2017
04:30AM
27/09/2017
05:10AM
420 Outage Ends
T_LAGA-1 27/09/2017
02:08AM
Unplanned Superseded 27/09/2017
01:10AM
27/09/2017
05:10AM
420 Boiler
T_LAGA-1 15/09/2017
15:17PM
Unplanned Ongoing 15/09/2017
15:30PM
15/09/2017
17:00PM
450 Boiler
T_LAGA-1 15/09/2017
14:19PM
Unplanned Ongoing 15/09/2017
14:18PM
15/09/2017
15:30PM
450 Boiler
T_LAGA-1 14/09/2017
23:09PM
Unplanned Superseded 15/09/2017
02:00AM
15/09/2017
14:00PM
450 Boiler
T_LAGA-1 14/09/2017
15:58PM
Unplanned Completed 15/09/2017
02:00AM
16/09/2017
05:00AM
905 Boiler
T_LAGA-1 04/09/2017
08:32AM
Unplanned Ongoing 07/09/2017
05:00AM
16/09/2017
05:00AM
450 Boiler
T_LAGA-1 01/09/2017
09:01AM
Unplanned Superseded 05/09/2017
14:00PM
07/09/2017
05:00AM
450 Turbine
T_LAGA-1 01/09/2017
08:50AM
Unplanned Ongoing 01/09/2017
05:00AM
05/09/2017
14:00PM
0 Turbine

Planned Outages

Asset ID Available Capacity (MW) Start Date End Date
T_LAGA-1 0 01/04/2020
23:00PM
10/04/2020
23:00PM
T_LAGA-1 0 15/04/2021
23:00PM
27/05/2021
23:00PM
T_LAGA-1 0 01/07/2022
23:00PM
04/08/2022
23:00PM
Show Archive

Static Data

Asset ID Normal Capacity (MW) Fuel Type Location Market
T_LAGA-1 905 Fossil Gas Plymouth GB BETTA Market