Location: Plymouth, Devon

Built: 2010

Fuel: Natural Gas

Capacity: 905MW

The tech: Two gas turbines, each with a heat recovery steam generator powering a steam turbine.

Did you know: 

Langage has a high-pressure steam system that enables market leading efficiency. The station’s flexible design is capable of two-shift operation and minimum load, enhancing our capability to support flexible energy generation.

When it was built, Langage was one of the highest efficiency air-cooled combined cycle plants in the world.

The soil excavated during construction was used to create Boringdon Park Golf Club in Plympton.